LOADING

Type to search

Energy Harbor and Standard Power to Develop Nuclear Energy Data Infrastructure

Energy Harbor and Standard Power to Develop Nuclear Energy Data Infrastructure

Energy Harbor Corp. and Standard Power announced they have signed a Memorandum of Understanding to develop a large-scale carbon free data infrastructure operation adjacent to Energy Harbor’s Beaver Valley nuclear facility in Shippingport, Pennsylvania. Under the terms of the agreement, the partnership will complete the required feasibility analysis to determine optimal engineering, co-location and implementation for a new data center. In phase 1, Standard Power will commit to a 10-year agreement to purchase between 200 and 300 MWs of 100% carbon free electricity and capacity through a direct connection to the Beaver Valley nuclear facility at a fixed price that reflects the value of the clean, baseload and carbon free attributes of nuclear power. Phase 1 of development is expected to come online in 2023 and 2024, with the opportunity to scale development up to 900 MWs in subsequent phases.

See related article: Bitcoin miners look toward nuclear power for sustainable energy

Energy Harbor’s Chief Operating Officer and Chief Nuclear Officer, David Hamilton, said “We appreciate the opportunity to build upon our strong relationship with Standard Power through this industry-transforming transaction. This effort is an important step in the transformation of the regions around our nuclear plants into Clean Energy Centers (CECs) that will be the necessary 24/7 carbon free, infrastructure backbone of the US economy.”

“This agreement and projects like the clean hydrogen pilot at our Davis-Besse Nuclear Station, demonstrate that clean energy infrastructure development near our nuclear facilities will create additional jobs and economic growth for our local communities. We look forward to the culmination of these efforts as we pursue Clean Energy Center (CEC) projects at our nuclear facilities in Ohio and Pennsylvania,” said Energy Harbor President and Chief Executive Officer, John Judge.

“Data infrastructure and the associated technology is energy intensive, and we recognize our responsibility to build a more environmentally sustainable future. Expanding our relationship with Energy Harbor strategically enables us to proactively structure our hosting capabilities to ensure that 100% of the power associated with this facility is carbon free,” said Maxim Serezhin, Standard Power’s Chief Executive Officer. 

For more information on Energy Harbor visit www.energyharbor.com

Source: Energy Harbor Corp.

Topics

Related Articles

Leave a Comment

Your email address will not be published. Required fields are marked *

LOADING

Type to search

Blog

GameChange Solar Brings Utility-Scale Tracker Technology to New Zealand
Monsoon Wind Powers Up 600 MW, First Cross-Border Wind Farm in Asia
Hong Kong Positions Itself as Global Hub as 90% of Family Offices Integrate ESG
Enfinity Global Secures $341M to Build 276 MW of Solar Projects in Italy
thyssenkrupp Nucera Acquires Green Hydrogen Systems Assets
Neuberger Berman Joins Blackstone in Backing Sustainability Software Provider Sphera
Ghana, Singapore Forge Sustainable Development and Carbon Market Partnership
Diginex, SGS Strengthen Alliance to Scale Sustainable Finance Solutions
Iberdrola España Starts Commissioning of €200M Ciudad Rodrigo Solar Plant
Protecting Nature Could Unlock Growth and Jobs, Says World Bank Report
image of the Triibe team on stage during event
Trump Administration Cuts $679 Million in Offshore Wind Funding
Thailand’s Tourism Authority Drives ESG Tourism to Boost Community Income, Global Recognition
PepsiCo Reports 2024 Progress on pep+ Sustainability and Nutrition Goals
RBI to Integrate Climate Resilience into India’s Financial System
BlackRock, LGIM Face $34 Billion Loss in Dutch Pension Shift
Denmark to Launch EU-Standard Green Bonds, Raising the Bar for Sovereign Issuance
RMI Welcomes 18 Climate Tech Innovators to Drive Global Decarbonization
Rolls-Royce, Microsoft Back HVO as Low-Carbon Fuel for Singapore Data Centres
Temasek’s GenZero Commits to Climate Impact Milestone by 2028
","session_id":"ep-sess-1760489029-j4S467na","page_url":"https:\/\/esgnews.com\/energy-harbor-and-standard-power-to-develop-nuclear-energy-data-infrastructure\/","post_id":"11377","tracking_enabled":"1","original_referrer":"","has_embedded_content":""}; /* ]]> */